Reported 1 day ago
Boeing has lowered its production rate of the 737 MAX to 31 jets per month from 38 due to ongoing delays in fitting wing systems, as reported by The Air Current. The Renton, Washington factory briefly achieved a production rate of 38 but faced increased assembly challenges, prompting the reduction. Boeing aims to eventually increase production back to 38 per month within the year.
Source: YAHOO