Reported about 1 year ago
To enhance water supply stability, Taiwan Water Corporation's Qishan Operation Office will conduct the 'Qishan George Water Valve Switch Burial Construction' today, resulting in a scheduled water cut-off for 8 hours in Qishan and Shanlin districts, affecting a total of 9900 households. The affected areas include various neighborhoods in Qishan and Shanlin, with normal water supply resuming slowly after the scheduled maintenance. Residents are advised to bear with the inconvenience caused by the water cut-off period.
Source: YAHOO